Trecothic Creek Station Construction |
|
Click on the thumbnail or caption to be taken to a larger, high-resolution version of the thumb nailed photograph. |
|
Columns in place, building the beams |


|
Nailing the beams together. |
|
Preparing both the columns and beams |
|
All images and material are property of their respective owners where noted. Otherwise, © 2007 by TrecothcCreekTrains.org |
|
This page was last updated: Monday, September 10, 2007 |
|
Reglar on a rather unstable looking “ladder” |
|
As was outlined on the TC&WR Station Page, we made do with a less than idea station for a long time. The series of pictures above show some of the phases in constructing the new Trecothic Creek Station. In the third picture above, 6 members are present. From the left to the right, we have Archie Jamieson supervising construction, Andrew Reid studying Ed Jordan (taking the photograph), Brian drilling a hole in the newly constructed beam, Earl Brown on the ladder above Brian drilling clearance holes in the pillars, Peter Reid with his back to the camera on the stepladder assisting Earl, and Peter Reglar hiding behind one of the steel columns. |
|
John takes passengers past the station |
|
Andrew Reid roofs the station solo |